  The Best Way to Satisfy Our Customer Is Quality !
Process Monitoring System
 
  • ERP/MRP software
  • MSA press production and scheduling system with real-time monitoring
  • Multiple Monitoring Terminals
  • Computerized SPC, PPAP Reports, Capability Studies, Gage R&R, FMEA's, Control Plans and DOE.
Mould Drawing Check
 
  • Before submitting the mould design drawings to customer for approval, our engineer will check the mould design according to the specification from customer. After finalized each detail, the engineer will fill in the Mold Drawing Checking Form and send together with the mould design CAD to customer for final approval.
Time Schedule
 
  • Once getting final approval from customer, a time schedule will be sent to customer for following up. We have personnel to check the each step of mould machining. And avoid any mistake hanppened in the machining process and this will help us to follow the time schedule.
 
Weekly Report
 
  • In order to keep the customer getting the latest status of the project, weekly report will be sent to customer by the person who is responsible for the project.
 
T1 Sample Checking
 
  • We will check the T1 sample's cosmetic and dimension to ensure they meet the specification of the customer's part drawing. The related data will be filled in T1 Sample Check Report. This report will be sent to customer while send out the T1 sample by DHL.
 
Mould dry run before shipping
 
  • And we will take a movie clip and send to customer for reference.
 
Mould Packing Inspection
 
  • Before shipping,make a packing inspection to ensure all the components,accessories and documents have been enclosed.
  • Documents enclosed:
  • Mould Inspection Check for Shipping
  • Steel Certification
  • Latest Injection Test Report
  • Drawing for Components of Mould
  • Final Mold Layout
  • Feedback Form of Mould Quality
 
 